Steelcoat System Selection Guide
| Surface Preparation | Protecting | Steelcoat Systems | Expected Service Life (years) |
Average Thickness (Microns) |
| Category A (abrasive blast cleaning) |
Steel Structures rigs, new jetty piles, decking, walkways, ramps, loading installations, very hot pipes plant, tanks, pipelines, cranes, bridges, steelcoat | 1000 1000 900 700 |
20-30 15-25 12-15 12-15 |
1500 1000 4-500 4-500 |
| Category B (power tool) |
process plant, pipe bridges, structural steel, pipework, fittings, pipelines, tie bars, storage tank bases, metal roof purlins, hot pipework |
700 500 400/D5 400 300 200 |
7-9 30 30 30 15 15 |
4-500 1600 1600 1400 1250 2300 (55% overlap) |
| Category C (handwire brushing) |
cold/damp pipes, badly rusted/pitted pipes and structural steelwork, fittings, pitted pipelines, old metal roof sheets | 100/ S105 100/ HT Primer 500/100(combined) 400/100(combined) |
15 15 30 30 |
1400 1400 3000 2800 |
| Category D (no cleaning) |
pre-stressing and post tensioning bridge cables and anchorages | 50 | 50 plus | sleeve/anchorage completely filled |
Note:
Preparation of galvanized steel and aluminium surfaces
Degrease and roughen surface by mechanical abrasion or abrasive sweep blasting.
Apply Denso Galvprime in accordance with the application instructions.
Apply two coats of Denso S.T. Epoxy in accordance with the application instructions.
| Surface Preparation: | |
| Category A | Abrasive blast cleaning, Standard: Sa2½ Surface profile: 50-75 microns |
| Category B | Fresh water wash down followed by a thorough hand/power tool cleaning Standard: St2 |
| Category C | Fresh Water wash down, heavy chipping hammers to remove heavy rust, thorough hand wire brushing to remove all loose scale and old coatings(conditions where St2 mechanical cleaning is not fully achievable due to condensation, deep pitting. |
| Category D | No cleaning required - new cables |
| Detailed Surface Preparation Data must be referred to. | |